Area Date Update
Lead Prow 11/08 5 Routes, 5.10a-5.11b
The Wave 11/07 21 Problems, V1-V11
The Arches 11/06 5 Routes, 5.10d-5.12a
Crack Wall 10/31 4 Routes, 5.10b-5.11d
The Island 10/30 14 Problems, V0-V7
Dihedral Wall 10/29 6 Routes, 5.7-5.12a